Custom fabricated platform for the base of a turbine for a hydro-electric project in the United States.

Project Date: 
Thursday, July 20, 2017
Material: 

A pair of custom fabricated fan housing assemblies.  Part of a power generation project.

Project Date: 
Monday, December 31, 2012
Material: 

Kubes Steel fabricated a series of draft tube liners (also known as penstocks) for the Cannelton Hydroelectric project located on the Ohio River.  Each assembled section is 30 feet in diameter and 60 feet long.  When completed, water from the Ohio River will be directed through the penstocks to the turbines, which will turn generators and produce approximately 88 Megawatts of electricity.  The project adjoins the existing Cannelton Locks and Dam in Kentucky.

Material: 

Stacks of rolled channel at the Kubes Steel rolling and bending shop.

Project Date: 
Thursday, July 13, 2006
Material: 

Multi-section custom fabricated pentock for a hydro-electric power generation project.

Project Date: 
Wednesday, February 21, 1990 to Monday, May 7, 1990
Material: 

Kubes Steel manufactured 3 hydraulic turbine scroll cases as part of a power generation project in the United States.  Assembled, tested and painted by Kubes Steel.

Project Date: 
Thursday, October 1, 1987 to Friday, April 1, 1988
Material: