Power Generation
Power Generation Projects:
Kubes Steel fabricated a series of draft tube liners (also known as penstocks) for the Cannelton Hydroelectric project located on the Ohio River. Each assembled section is 30 feet in diameter and 60 feet long. When completed, water from the Ohio River will be directed through the penstocks to the turbines, which will turn generators and produce approximately 88 Megawatts of electricity. The…
Project Address
Cannelton Hydro Electric
Hawesville, KY 42348
United States
Service Category:
Project Date:
Friday, March 1, 2013
Market:
Material:
Project Date:
Monday, December 31, 2012
Market:
Material:
Service Category:
Project Date:
Thursday, July 13, 2006
Market:
Material:
Service Category:
Project Date:
Monday, May 7, 1990
Market:
Material:
Kubes Steel manufactured 3 hydraulic turbine scroll cases as part of a power generation project in the United States. Assembled, tested and painted by Kubes Steel.
Service Category:
Project Date:
Saturday, April 1, 1989
Market:
Material:
- « Previous
- 1
- 2