Follow Us:      

Call Us: 1.877.327.8357

Menu

We have the lift and space for the job.

  • 100,000 + sq. ft. Fabrication Facilities

  • 55' x 600' Maximum Assembly Bay

  • 80 Ton Maximum Lift

Kubes fabricated and machined these heavy duty, industrial scale components. We are specialists in fitting, welding, machining and assembly of any components like these.

Project Date: 
Wednesday, April 10, 2019
Market: 
Material: 

Here is one of three Roll Cradles fabricated by Kubes Steel.

Service Category: 
Project Date: 
Friday, February 22, 2019
Market: 
Material: 

We take a look at some of the projects being worked on at the Kubes Steel shop on Industrial Drive in Hamilton. There are many different types of Heavy Fabrication taking place.

Project Date: 
Friday, October 5, 2018
Material: 

Custom fabricated platform for the base of a turbine for a hydro-electric project in the United States.

Project Date: 
Thursday, July 20, 2017
Material: 

Custom fabricated 12' x 23'-6" bisulfite tanks for a chemical complex in Louisiana, USA.

Material: 

Kubes Steel fabricated a series of draft tube liners (also known as penstocks) for the Cannelton Hydroelectric project located on the Ohio River.  Each assembled section is 30 feet in diameter and 60 feet long.  When completed, water from the Ohio River will be directed through the penstocks to the turbines, which will turn generators and produce approximately 88 Megawatts of electricity.  The project adjoins the existing Cannelton Locks and Dam in Kentucky.

Material: 

A pair of custom fabricated fan housing assemblies.  Part of a power generation project.

Project Date: 
Monday, December 31, 2012
Material: 

Custom fabricated maintenance mezzanine platform made from light weight, corrosion resistant aluminum.

Project Date: 
Monday, July 23, 2012
Market: 
Material: 

Series of custom fabricated refractory casting towers manufactured by Kubes Steel for a steel mill.

Project Date: 
Thursday, November 27, 2003 to Friday, February 13, 2004
Market: 
Material: 

Custom fabrication for a diamond mine.

Project Date: 
Thursday, November 27, 2003
Market: 
Material: 

Pages