Heavy Fabrication

Kubes Steel has a long, rich history of heavy fabrication and our manufactured work has made it as far south as South America.  Explore our resume below or contact us today to start your quote.

Heavy Fabrication Projects:

Fabrication of the top of a 930 ft. elevator shaft reline (92 shells x 14’ – 6’’ dia. x 10 ft. long.)  Starting from the bottom the shells are more heavily constructed and as we get nearer the surface the shell thickness lessens as do the number of external stiffener rings. The average weight per shell…

Project Date:
Tuesday, November 1, 2016
Market:
Material:

Kubes Steel fabricated a series of draft tube liners (also known as penstocks) for the Cannelton Hydroelectric project located on the Ohio River.  Each assembled section is 30 feet in diameter and 60 feet long.  When completed, water from the Ohio River will be directed through the penstocks to the turbines, which will turn generators and produce approximately 88 Megawatts of electricity.  The…

Project Address
Cannelton Hydro Electric
Hawesville, KY 42348
United States
Project Date:
Friday, March 1, 2013
Material:

A large, heavy steel fabrication project gets shipped out from Kubes Steel.

Project Address
Kubes Steel - Jones Road
323 Jones Rd.
Stoney Creek, ON L8E5N2
Canada
Project Date:
Monday, January 11, 1993
Market:
Material:

Kubes Steel manufactured 3 hydraulic turbine scroll cases as part of a power generation project in the United States.  Assembled, tested and painted by Kubes Steel.

Project Date:
Saturday, April 1, 1989
Material: