2013.01.23 – St. Patrick’s Bridge

Kubes Steel supplied the rolled pipe for the St. Patrick’s Bridge project.  The St. Patrick’s bridge is a 184 metre long cable stayed bridge conforming to AESS standards. It is a key part of the revitalization of St. Patricks Island in Calgary, AB.

Project Date:

Wednesday, January 23, 2013

Market:

Material: