Steel
Kubes Steel started out with steel fabrication and it has become our specialty. We’re known throughout North America for our steel rolling, bending and fabrication capabilities.
We offer custom fabrication, rolling, bending and welding services covering all shapes and sizes of parts.
Steel Projects:
Kubes Steel did all the rolling, forming, bending and fabrication this project; the feature staircase of the new Penn Presbyterian Medical Centre in Philadelphia, Pennsylvania.
Curved architectural staircase at Gettysburg College PA featuring rolled steel from Kubes Steel.
Kubes Steel was the fabricator and roller bender of the structure that serves as the base for the coloured cone features.
Custom fabricated feature staircase installed in the Brotherhood of Carpenters Local 1946 office in London, Ontario.
Kubes Steel did the fabrication and rolling and bending of the tubular columns of the Queen Richmond West Centre in Toronto. Known as a delta frame, the tubular columns support the ‘building in the air’ at 134 Peter Street. For more info on the project check out the Globe’s article: Totally Tubular Design Pays Off for…
Kubes Steel did the steel section bending for the inside structure of the Stone Road Mall in Guelph, Ontario as well as the pipe bending for the outside steel awning.
Kubes Steel rolled steel for both the water tower (rolled joist angles & compressions rings) and for the pumping station (rolled structural steel) for this project in Guelph, Ontario.
Kubes Steel was contracted to build the track for the latest roller coaster for Canada’s Wonderland. Known as The Guardian, the roller coaster is part of an interactive ride that starts inside Wonder Mountain. Kubes was tasked with the full fabrication, fitting and pipe bending of the roller coaster track and the adjoining railing for…
Kubes Steel fabricated a series of draft tube liners (also known as penstocks) for the Cannelton Hydroelectric project located on the Ohio River. Each assembled section is 30 feet in diameter and 60 feet long. When completed, water from the Ohio River will be directed through the penstocks to the turbines, which will turn generators and produce approximately 88 Megawatts of electricity. The…