Power Generation
Power Generation Projects:
Custom fabricated platform for the base of a turbine for a hydro-electric project in the United States.
Kubes Steel fabricated a series of draft tube liners (also known as penstocks) for the Cannelton Hydroelectric project located on the Ohio River. Each assembled section is 30 feet in diameter and 60 feet long. When completed, water from the Ohio River will be directed through the penstocks to the turbines, which will turn generators and produce approximately 88 Megawatts of electricity. The…
Kubes Steel manufactured 3 hydraulic turbine scroll cases as part of a power generation project in the United States. Assembled, tested and painted by Kubes Steel.
- « Previous
- 1
- 2