2016.07.20 – Fabricated Bridge Arches Shipping Out

Fabricated sections of the Burgoyne Bridge featuring 30 inch pipe bent by Kubes Steel gets shipped out from Walters on it’s way to paint.

Date:

Wednesday, July 20, 2016