Timeline

2019
2019
November 26, 2019
Kubes Steel is custom fabricating these leading and trailing edges for Stay Vanes out of carbon steel. Used...
Kubes Steel North Beach Miami Bandshell Canopy - Central Column
November 26, 2019
Kubes Steel is custom fabricating the central column for the North Beach Miami Bandshell Canopy...
Kubes Steel Galvanized Steel Lintels
November 20, 2019
The Ontario Building Code requires the use of lintels for masonry over openings. Kubes Steel's custom...
2019
November 19, 2019
Kubes Steel is custom fabricating the central column for the North Beach Miami Bandshell Canopy...
Kubes Steel Braced Curved Plate - Rings
November 6, 2019
Heavy Segmented Ring Assemblies Showcase The Broad Fabrication Capabilities of Kubes Steel   Ring Assembly...
Kubes Steel Hard Face Roll Refurbishment
October 30, 2019
Kubes Steel offers refurbishment services for hard faced rolls used in several industries including aggregates / mining, coal and manufacturing...
Kubes Steel Braced Curved Plate
October 23, 2019
Kubes Steel is your one stop shop for custom fabrication. Here we're working on another large...
Kubes Steel Miami North Beach Bandshell Canopy Artist's Rendition
October 23, 2019
Kubes Steel is cold rolling the AESS pipe sections for the "ring" portion and fabricating...
Kubes Steel Veterinary Surgical Tool
October 10, 2019
Kubes Steel designed and custom made this prototype surgical tool for a veterinarian. In addition...
2019
October 1, 2019
Kubes Steel provided the custom fabrication services for this massive Rotary Dryer Drum Shell. It's...
2019
September 16, 2019
15 years ago, Kubes Steel rolled the Architecturally Exposed Structural Steel arches for the central intersection...
2019
September 3, 2019
You can rely on Kubes Steel's own trucks and drivers to deliver your project on time....
2019
August 27, 2019
Work continues on additional pieces for this industrial duct system. Here we can see some...
2019
August 20, 2019
Our welders have installed the Flights inside the shell and are adding the external gearing...
2019
July 30, 2019
Welding work continues on the shell. The next step is to install the Flights inside...
2019
July 23, 2019
The shell sections are being welded together to form the full size shell.
2019
July 22, 2019
Kubes Steel formed these square steel tubes into this custom shape requested by the customer.
2019
July 16, 2019
The first stage of the shell fabrication are the individual sections formed into cylinders using our...
2019
July 16, 2019
Kubes Steel is your one stop shop for custom fabrication projects of any size. We turn...
2019
July 12, 2019
Kubes Steel turned flat plate steel into these tower halves using our brake presses and...
2019
July 3, 2019
Kubes Steel custom fabricated this heavy industrial door and it's mounting frame to withstand extreme...
2019
July 3, 2019
At Kubes Steel, induction bending is one of our specialties. Our skilled operator performed the...
2019
June 27, 2019
Kubes Steel was honoured to recently receive The Legacy Award from the Stoney Creek Chamber of...
2019
June 25, 2019
Kubes Steel is custom fabricating several of these Roll Racks down at our shop on...
2019
June 25, 2019
Kubes Steel custom fabricated this holding tank in 2 halves, including custom made pipe to...
2019
June 9, 2019
Kubes Steel revisited the Vaughan Metro Centre now that it's completed to take a look...
2019
May 28, 2019
Kubes specializes in custom fabrication jobs like this. As a full service shop, we were...
2019
May 28, 2019
This combustion tube was custom fabricated by Kubes Steel to strict tolerances. The tube is 26'...
2019
May 15, 2019
We visited the finishing and paint shop where the conduit frame rings that were fabricated...
2019
May 10, 2019
Kubes Steel is your one stop shop for fabrication. We provided all the services needed to...
2019
May 8, 2019
Kubes Steel can fabricate a wide range of products, large and small. We recently formed...
2019
April 23, 2019
These rings are part of a heavy duty underground conduit system. Kubes Steel bends and...
2019
April 23, 2019
At Kubes Steel, custom fabrication is our specialty. We can make almost anything you can...
2019
April 10, 2019
These heavy steel frames will be used to hold customizable modular components. Kubes Steel performed...
2019
April 10, 2019
Kubes fabricated and machined these heavy duty, industrial scale components. We are specialists in fitting,...
2019
April 2, 2019
These spiraled staircase stringers are custom fabricated by Kubes Steel. We roll and assemble them...
2019
March 26, 2019
Kubes had to use a special setup to achieve the bends required by our customer...
2019
March 20, 2019
Our team induction bends sections of pipe to customer requirements and inspects the finished product.
2019
March 5, 2019
Kubes was selected as the fabricator to make these towers for electrical transmission lines. Each half...
2019
February 27, 2019
The beams for this sculpture were rolled by Kubes and shipped to Russell, Manitoba where it...
2019
February 22, 2019
Here is one of three Roll Cradles fabricated by Kubes Steel.
2019
January 23, 2019
Kubes Steel did the bending on these pre-painted aluminum channels. Our custom, in house process allows...
2018
January 7, 2019
A new brake press from Pacific has been installed at the Kubes Steel main shop. One...
2018
2018
December 18, 2018
Our forming methods are precise. We can custom bend and form all types of metal...
2018
October 22, 2018
The Unipetro Station in Brampton is a great example of Architecturally Exposed Structural Steel. Inside...
2018
October 18, 2018
We revisited the Spirit Of Discovery sculpture in late Autumn of 2018. A striking modern...
2018
October 17, 2018
Kubes Steel rolled the structural steel sections for the now open largest elevated Go Kart...
2018
October 5, 2018
Take a look at some of the projects being worked on at the Kubes Steel...
2018
March 23, 2018
Kubes Steel rolled and fabricated the 8 foot tapered 'feet' for each of the 3...
2018
March 6, 2018
An example of aluminum bending used in the outside framing for an auto dealership in Mississauga, Ontario.  ...
2018
February 28, 2018
We tracked down an early Kubes Steel fabrication project to Greensville, Ontario.  This pedestrian bridge, spanning...
2018
January 19, 2018
Custom fabrication work by Kubes Steel.  Kubes Steel fabricated the steel structure for each of...
2017
January 2, 2018
Massive sections of plate with a diameter of 64’ get rolled at Kubes Steel, part...
2017
2017
December 28, 2017
Kubes Steel did the rolling and bending work for the entrance awning for Caesars Casino...
2017
December 13, 2017
A large section of steel pipe that was bent to a tight radius on the Kubes...
2017
November 21, 2017
The Induction Bending machine at Kubes Steel gets put to work bending Sections of HSS with...
2017
November 9, 2017
Another fantastic public art installation featuring rolling and bending work by Kubes and designed by Dam...
2017
November 3, 2017
The feature piece at the entrance of the Grey Roots Museum and Archives in Georgian...
2017
October 30, 2017
Kubes Steel rolled the structural steel sections for the soon to be open Niagara Speedway,...
2017
October 27, 2017
"Rafaga Unleashed" by Dam De Nogales is a stainless steel, and bronze public art sculpture...
2017
October 26, 2017
"Approaching Red" by Maha Mustafa is a public art sculpture on permanent display in Toronto located...
2017
October 26, 2017
"Orenda" by Marlene Hilton-Moore is a stainless steel art sculpture in Toronto that was custom fabricated and manufactured by...
2017
October 24, 2017
The nearly complete Vaughan Metropolitan Centre Station features rolled plate and structural steel sections rolled by...
2017
October 20, 2017
The Unipetro Station at the corner of Mississauga Road and Steeles Ave West is located...
2017
September 7, 2017
Custom fabricated steel trellis located on the corner of Plains Road and King road in Aldershot/Burlington...
2017
August 19, 2017
Kubes Steel did the pipe bending for the tapered 'legs' of these public art sculptures in...
2017
August 16, 2017
The Tecumseh Monument is located in Thamesville, Ontario.  Resembling a large turtle shell, the stainless steel...
2017
August 15, 2017
The completed Burgoyne Bridge in St. Catharines Ontario features 42" steel pipe bent by Kubes...
2017
August 12, 2017
The Guelph Water Tower and Pumping Station on a dark and stormy night.  Kubes Steel...
2017
July 20, 2017
Progress on the fabrication of a turbine platform for a hydro-electric project in the US.
2017
July 12, 2017
One of our first feature pieces, this stainless steel sculpture 'Willow Leaf' wraps around a...
2017
June 22, 2017
Two custom fabricated bisulfite tanks shipping out from Kubes Steel's Jones Road location in Stoney...
2017
June 19, 2017
Rectangular sections of HSS (Hollow Structural Section) are getting bent at Kubes Steel the hard...
2017
June 15, 2017
Kubes Steel did the pipe bending for George C. King bridge in East Calgary.  The...
2017
May 25, 2017
Aerial photography of the custom fabricated bisulfite tanks for a chemical plant in the US.
2017
May 18, 2017
Two custom fabricated bisulfite tanks, post successful water test. No leaks!
2017
May 5, 2017
The second of two bisulfite tanks custom fabricated at the Kubes Steel Jones Road shop.
2017
April 10, 2017
The completed Burgoyne Bridge in St. Catharines featuring 30 inch pipe bent by Kubes Steel.
2017
April 8, 2017
Custom fabricated acid tank in the horizontal position awaiting movement outside for a full tank...
2017
April 7, 2017
2 custom fabricated bisulfite storage tanks with dimensions 12' - 23' - 6".  The one tank...
2017
March 31, 2017
One of the custom fabricated acid tanks manufactured at Kubes Steel's Jones Road shop.
2017
March 22, 2017
Night shots of QRC West and it's unique Delta Frame in downtown Toronto.  Kubes Steel...
2016
2016
November 9, 2016
Erection of structural steel with connection nodes fabricated by Kubes Steel for Parliament Hill's new atrium...
vaughan-metropolitan-centre-subway-station-client-benson-steel-rolling-bending-beams-steel-sections-plate-6
November 7, 2016
Kubes Steel supplied rolled beams and plate for the construction of the new Vaughan Metropolitan...
2016
November 7, 2016
Kubes Steel supplied the rolled structural steel sections for the update to the Lakeview Water...
kubes-steel-mississauga-go-station-rolled-hss-2
November 4, 2016
Rolled HSS from Kubes Steel featured in the outside structure of this GO Station parking...
2016
November 3, 2016
The arches of the Burgoyne Bridge, erected in St. Catharines, Ontario, was manufactured with 30 inch...
2016
November 1, 2016
Custom fabricated sections for an elevator shaft reline, awaiting shipment at Kubes Steel.
2016
October 22, 2016
This large custom fabricated shell being rigged onto the Empire transport truck is the last shell...
2016
September 28, 2016
Cambering steel beam sections at Kubes Steel.
2016
September 27, 2016
Watch a time-lapse video of this project: youtu.be/GumLoOZEv_Q Photos of the 2D Induction Bending process...
2016
September 12, 2016
Sections of the elevator shaft reline project in the shop.  Custom fabricated by Kubes Steel.
2016
July 20, 2016
Sections of the elevator shaft reline project, rolled and custom fabricated by Kubes Steel.
2016
July 20, 2016
Fabricated sections of the Burgoyne Bridge featuring 30 inch pipe bent by Kubes Steel gets...
2016
July 13, 2016
Aluminum framing assembly nearing completion at the new US Embassy, London, UK.
2016
June 3, 2016
Installation of the curved feature piece on the outside of the new U.S. Embassy in...
2016
May 31, 2016
A pair of support 57 ft. long girders fabricated by Kubes Steel for the Moise SAFRA Community...
2016
May 21, 2016
Recently completed metal sculpture custom fabricated by Kubes Steel in stainless steel. NY, New York.
2016
April 26, 2016
Photos of the progress on a heavy, custom fabricated elevator shaft reline for a mining...
2016
March 30, 2016
Photos showing the final 30" steel pipes being bent by Kubes Steel along with some...
2016
March 19, 2016
Custom fabricating and rolling and bending work by Kubes featured at the new Phoenix AZ...
2016
March 7, 2016
Photos of one of the long, heavy pipes with a 30" diameter bent by Kubes...
2016
February 8, 2016
Kubes Steel did custom fabricating and rolling and bending for the new LRT Extension stations...
2015
2015
September 15, 2015
Long section of tube gets bent for a pipeline using the induction bending method at...
2015
August 6, 2015
A steel beam gets bent at the Kubes Steel rolling and bending shop using the...
2015
August 4, 2015
Induction bending square HSS to a tight radius on the Kubes Steel induction bender.
2015
July 28, 2015
Photos showing the progress of a section of HSS being bent on the Kubes Steel...
2015
July 22, 2015
Photos of a section of High Strength Structural Steel (HSS) being bent on the Kubes...
2015
July 20, 2015
Photos of a section of steel pipe being bent on the induction bender at Kubes...
2015
January 16, 2015
Installation of the completed feature staircase for the Penn Presbyterian Medical Centre.
2014
2014
November 25, 2014
Photos of variously sized aluminum extrusions that can be rolled and bent by Kubes Steel.
2014
October 4, 2014
Kubes Steel did the rolling, bending and fabrication of the feature staircase for the Penn...
2014
September 18, 2014
AESS Feature staircase at BMW North America Headquarters in Woodcliff Lake, New Jersey.  Kubes Steel...
2014
September 18, 2014
"Veil" by Monica Ponce de Leon, installed at the Conrad Hotel in New York City,...
2014
September 17, 2014
Photos of the completed Grand Staircases at the American Music Theatre in Lancaster, Pennsylvania.
2014
September 17, 2014
Photos of the feature staircase at Gettysburg College, PA.  Steel rolled and bent by Kubes...
2014
September 8, 2014
Photos of Summer Clouds, a public art sculpture located at Concord Park Place, in North York Ontario.
2014
September 8, 2014
Photos onsite in North York Ontario of the Four Seasons installation by Douglas Coupland.  Underlying...
2014
September 5, 2014
Photos prises sur place de l’auvent en acier mettant en vedette le tuyau roulé par...
2014
September 5, 2014
Some photos of a curved staircase custom fabricated by Kubes Steel, installed at the Brotherhood...
2014
September 5, 2014
Photos taken onsite of the fabricated steel awning featuring rolled pipe by Kubes Steel.
2014
September 5, 2014
Photos taken in Guelph Ontario of the completed pumping station and water tower featuring rolled...
2014
September 4, 2014
Kubes Steel did the custom fabricating of these tapered legs as part of the feature...
redbanner
September 4, 2014
The finished installation of 'Approaching Red' in Toronto, Ontario.
2014
August 27, 2014
Wisdom Sculpture by Gordon Reeve Taking Shape at Kubes Steel's Burlington Street Shop.
2014
August 27, 2014
Stainless steel pipe/tube being assembled at Kubes Steel's Burlington Street Shop in Hamilton, Ontario.  Part...
2014
August 10, 2014
On August 10th, 2014, Kubes Steel celebrated their 40th anniversary with a family company picnic...
2014
April 22, 2014
Photos from the outside of Wonder Mountain showing sections of The Guardian, a new roller...
2014
April 2, 2014
A look up towards Wonder Mountain of The Guardian, a new roller coaster for Canada's...
2014
April 1, 2014
Outside view showing a section of The Guardian roller coaster manufactured by Kubes, alongside it's...
2014
March 31, 2014
On site assembly of The Guardian Roller Coaster.
2014
January 15, 2014
A section of The Guardian delivered by Kubes Steel to Canada's Wonderland.
2014
January 14, 2014
Wonder Mountain getting ready for the installation of The Guardian.
2013
2013
December 24, 2013
Final assembly of The Guardian, roller coaster for Canada's Wonderland, custom manufactured by Kubes Steel.
2013
December 20, 2013
Fitted and fabricated, sections of The Guardian, roller coaster for Canada's Wonderland ships out for...
2013
December 18, 2013
Second trial fit of a section of The Guardian, a custom manufactured roller coaster for...
2013
December 12, 2013
Trial assembly of a section of The Guardian roller coaster for Canada's Wonderland.
2013
November 28, 2013
Early trial fit of The Guardian roller coaster for Canada's Wonderland.
2013
November 25, 2013
1st round of steel pipes rolled for The Guardian roller coaster, Canada's Wonderland.
2013
March 18, 2013
Photos showing the fabrication of penstock draft tube liners for the Cannelton Hydro Project at...
2013
March 8, 2013
A section of steel plate brake press formed at Kubes Steel.
2013
March 1, 2013
Photos showing the fabrication of the hydroelectric penstock draft tube liners for the Cannelton Hydro...
2013
February 7, 2013
The Newtown Creek Digesters, featuring a stainless steel railing system manufactured by Kubes Steel.
2013
January 31, 2013
These photos come courtesy of The International Brotherhood of Boiler Makers and show the assembled...
2016
January 23, 2013
Rolled pipe being custom fabricated into the main arches for St. Patrick's Bridge, Calgary, AB.
2013
January 9, 2013
Sections of the hydro draft tube liners getting fabricated at Kubes Steel.
2012
2012
December 31, 2012
Custom fabricated fan housing assemblies.
2012
December 29, 2012
Construction on the new Lakeview Water Treatment plant moves closer to completion, with large sections...
2012
December 7, 2012
Curved structural steel roof beams at the Lakeview Water Treatment plant rolled by Kubes Steel.
2012
December 3, 2012
Roof beams of the Lakeview Water Treatment Plant were rolled by Kubes Steel.
2012
November 27, 2012
Steel erection work continues at the Lakeview Water Treatment Plant which features rolled steel sections...
2012
November 16, 2012
As the roof of the Lakeview Water Treatment nears completion, another section gets an addition...
2012
November 13, 2012
Installation of the curved architectural staircase custom fabricated by Kubes Steel.
2012
October 24, 2012
A couple of iron workers sit on the rolled structural steel beams that were rolled...
2012
October 18, 2012
Progress being made at the Lakeview Water Treatment Plant.  Rolled structural steel sections by Kubes...
2012
October 11, 2012
Rolled steel sections by Kubes Steel get a bit of sunshine at the expanded Lakeview...
2012
October 3, 2012
Assembled sections make up a draft tube liner (penstock) for the Cannelton Hydro Project.
2012
August 27, 2012
A large structural steel section gets rolled the hard way.  Kubes can bend structural steel...
2012
August 17, 2012
The new expansion of the Lakeview Water Treatment Plant features a roof with rolled structural...
2012
August 16, 2012
Rotor drums rolled on the plate roll and fabricated by Kubes Steel for the Cannelton...
2012
August 2, 2012
Section bending large steel beams the Hard Way on the Roundo R13 Pyramid Rolling Machine at...
2012
July 25, 2012
A section of draft tube liner (penstock) for the Cannelton Hydro Project shipping out from the...
2012
July 23, 2012
Completed custom fabricated maintenance mezzanine platform made from light weight, corrosion resistant aluminum.
2012
July 13, 2012
Industrial fabricated rotor support by Kubes Steel for the Cannelton Hydro Project.
2012
June 21, 2012
Rolled steel sections by Kubes Steel shipping out to be installed at the new Lakeview...
2012
June 12, 2012
Industrial fabricated rotor lifting device. Part of the Cannelton Hydro Project.
2012
January 2, 2012
The David Leitner film, Newtown Creek Digester Eggs:  The Art of Human Waste features some...
2011
2011
December 22, 2011
Lots of different kinds of material in the rolling and bending shop:  channel, HSS, section...
2011
November 18, 2011
A deflector cone fabricated by Kubes Steel for the Cannelton Hydro Project.
2011
November 17, 2011
Custom Fabrication of a Draft Tube Penstock at Kubes Steel for the Cannelton Hydro Project.
2011
November 9, 2011
Custom Fabrication of a Centering Deflector Cone at Kubes Steel.
2011
October 18, 2011
Michael Walch participated in the annual Open House New York architecture crawl and took some...
2011
October 15, 2011
Important accessories to the main plant's work, the Digester Eggs at Newtown Creek feature a system...
2011
August 15, 2011
Custom fabrication of penstock sections for the Cannelton Hydro Project in mid August, 2011.  
2011
August 4, 2011
The Newtown Creek WWTP is located in Greenpoint, NY and was once home to a canal, and...
2011
July 12, 2011
"Its stainless steel digester "eggs" dominate the local skyline to demonstrate that with care, even...
2010
2010
December 21, 2010
Photos of rolled aluminum rings by Kubes Steel.
2010
October 7, 2010
Blogger Baad Lamb published an outstanding blog about how the Newtown Creek Waste Water Treatment...
2010
September 28, 2010
Press Brake/Brake Press forming a cone at Kubes Steel.
2010
April 21, 2010
From the New York City Environmental Protection Agency: Located in Brooklyn’s Greenpoint community, Newtown Creek...
2009
2009
October 11, 2009
Kubes Steel manufactured the stainless steel railing for the Newtown Creek Wastewater Treatment Plant giving...
2009
August 7, 2009
A view of the Manhattan skyline from the top of the Newtown Digester egg.  Kubes...
2008
2008
September 19, 2008
Sections of super market barricade pipe bent on the Kubes Steel Rotary Draw Bender.
2008
September 9, 2008
Photo of the AESS arches rolled by Kubes Steel for Yankee Stadium, New York, New York.
2008
July 9, 2008
Different photos of the arches using the rolled AESS by Kubes Steel for Yankee Stadium,...
2008
March 13, 2008
Cones formed from steel plate on the brake press at Kubes Steel.
2008
March 13, 2008
Sections of pipe bent at Kubes Steel on the rotary draw bender ready to be...
2008
February 7, 2008
Pipe bent on the Kubes Steel rotary draw bender ready to be shipped out.
2008
February 7, 2008
A section of structural steel gets rolled to a very tight radius at Kubes Steel...
2008
February 6, 2008
Short threaded pipe sections getting bent on the rotary draw bender at Kubes Steel.
2008
February 6, 2008
Sections of aluminum channel rolled toe in at the Kubes Steel rolling and bending shop.
2008
February 5, 2008
Sections of rolled channel, rolled toe in and rolled toe out ready for shipment at...
2008
February 5, 2008
Photos of rolled angles ready for shipment.
2008
January 31, 2008
Rotary draw bending stainless steel pipe at the Kubes Steel rolling and bending shop.
2011
January 7, 2008
Pipe bent by Kubes Steel as part of the Intel CES 2008 Display.
2008
January 4, 2008
A large section of steel channel gets rolled toe out at Kubes Steel.
2007
2007
December 31, 2007
A section of steel angle gets rolled leg out at Kubes Steel.
2007
December 10, 2007
Pipe bent for the 2008 Intel CES Display gets assembled at Kubes Steel.
kubes-steel-steel-bending-rectangular-hss-easy-way-curtain-wall-support
November 27, 2007
Kubes Steel rolling rectangular HSS the easy way for a curtain wall support project.  Job being...
kubes-stee-structural-section-bending-beam-easy-way-complex-curve-monorail
November 2, 2007
Structural steel section being rolled cold on the Roundo R13 into a complex curve for...
2007
November 2, 2007
A section of steel channel being rolled toe out to a tight radius at the...
2007
January 31, 2007
One of the earliest photos we could find of the Newtown Creek Waste Water Treatment...
2006
2006
August 23, 2006
Sections of rolled metal tubing for an oil and gas pipeline ships out from Kubes...
2006
July 25, 2006
A large, thick section of pipe gets bent at the Kubes Steel rolling and bending...
2006
July 25, 2006
Brake press forming steel angle at Kubes Steel.
2006
July 13, 2006
Stacks of rolled steel channel at the Kubes Steel rolling and bending plant.
2006
July 12, 2006
Photos of the awning at Caesars Windsor Casino.  The awning features rolled steel from Kubes...
2006
July 12, 2006
The light up awning outside of Caesars Windsor Casino features rolled steel by Kubes Steel.
2006
June 20, 2006
Photos of the installed Spirit of Discovery stainless steel, bronze sculpture outside the Donnelly Centre of...
2006
January 3, 2006
Stretch forming an aluminum extrusion at Kubes Steel.
2005
2005
July 25, 2005
Photos of the recent installation of the Spirit of Discovery stainless steel and bronze sculpture...
2004
2004
September 10, 2004
Inside photos of the rolled structural steel from Kubes Steel at the Western Fairgrounds.
2004
August 23, 2004
Photos from the summer of 2004.  Kubes Steel supplied the rolled steel for the construction...
2004
August 23, 2004
Some pictures from different angles of the Rafaga Unleashed stainless steel and bronze sculpture at...
2004
August 23, 2004
Photos taken from Front Street in Toronto, Ontario showing the fabricated stainless steel AESS sculpture...
2004
July 22, 2004
The completed sculpture at Pier 8 in Hamilton, Ontario.
2004
July 22, 2004
A crane does some heavy lifting as the finished stainless steel portion of the project...
2004
June 24, 2004
Fabricated Steel Staircase for the Avon World Headquarters in New York, New York.
2004
June 18, 2004
Rafaga Unleashed nearing completion inside the shop.
2004
June 17, 2004
Custom fabricated steel staircase for the Avon World Headquarters nearing completion.
2004
June 13, 2004
Progress of the custom fabricated steel staircase for Avon World Headquarters.
2004
June 8, 2004
A collection of rolled steel channel at the Kubes Steel rolling and bending shop.
2004
June 7, 2004
More photos in progress including a closeup of part of the stainless steel pipe where...
2004
June 3, 2004
Some close-up shots of the progress of Rafaga Unleashed fabrication.
2004
June 1, 2004
Early phase in the fabrication of a steel staircase for the Avon World Headquarters in...
2004
May 26, 2004
A section of the sail taking shape.
2004
May 12, 2004
Photos of the progress being made on the fabrication of Rafaga unleashed.
2004
May 7, 2004
Photos of the construction progress of the Western Fairgrounds featuring rolled structural steel (AESS) rolled...
2004
May 5, 2004
Steel rolled by Kubes Steel was part of the construction of the new Audi Dealership...
2004
May 4, 2004
On site of the recently installed custom fabricated steel trellis in Burlington-Aldershot, Ontario outside the...
2004
May 4, 2004
Kubes Steel supplied rolled steel for the contruction of the new Budds' BMW dealership.
2004
May 4, 2004
Kubes Steel supplied the rolled aluminum for the outside framing feature of this Mercedes Dealership...
2004
March 8, 2004
Rolled steel as part of the AESS Arches in Hess Village, Hamilton, Ontario.  Steel rolled...
2004
February 23, 2004
Stainless steel AESS pipe sculpture being fabricated in house at Kubes Steel.
2004
February 20, 2004
Custom Fabricated Rolled Cylinders.
2004
February 13, 2004
One of the last custom fabricated refractory casting tower manufactured by Kubes for a steel...
2004
January 29, 2004
Painted refractory casting towers manufactured by Kubes Steel for a steel mill.
2004
January 20, 2004
A section of steel channel gets rolled at Kubes Steel to a tight radius.
2004
January 9, 2004
A steel beam gets rolled the hard way at Kubes Steel.
2003
2003
December 21, 2003
3 refractory casting towers custom fabricated by Kubes Steel for a Steel Mill.
2003
December 10, 2003
Inside and outside shots of a custom fabricated refractory casting tower for a Steel Mill...
2003
December 8, 2003
Rolling a steel tee the hardway (stem in)
2003
November 27, 2003
Large heavy custom fabrication for a diamond mine.
2003
November 17, 2003
Custom fabricated refractory casting towers manufactured by Kubes Steel for a steel mill.
2003
November 13, 2003
Different custom fabricated components for a dimond mine in the mining industry.
2003
September 30, 2003
HSS (Hollow Structural Sections) rolled by Kubes Steel at the Kubes rolling and bending shop...
2003
September 3, 2003
Fabricated steel trellis fabricated at Kubes Steel pre-painting.
2004
June 24, 2003
Custom fabrication job shipping out from Kubes Steel in Stoney Creek, Ontario.
2003
April 16, 2003
Custom fabricated rolled cylinders in the spring of 2003.
2003
April 10, 2003
Photos of rolled aluminum rings ready to be shipped out to the customer.
2000
2000
January 14, 2000
Calcine transfer container custom fabricated by Kubes Steel.
2000
January 5, 2000
Custom fabricated calcine transfer container manufactured by Kubes Steel.
1999
1999
December 22, 1999
Close up of some of the fabrication work for the calcine transfer container manufactured by...
1994
1994
January 6, 1994
Early examples of cones formed at Kubes Steel, 1994.
1993
kubes-steel-industrial-fabricating-shipping-2
January 11, 1993
A heavy, industrial fabrication shipping out from Kubes Steel.
1992
1992
October 2, 1992
Front and back views of the finished custom fabricated burner assembly by Kubes Steel.
1992
September 30, 1992
Nearing completion, burner assembly custom fabrication by Kubes Steel.
1992
September 28, 1992
Burner assembly coming together at Kubes Steel.
1992
September 17, 1992
Progress being made on the custom fab of the burner assembly by Kubes Steel.
1992
September 16, 1992
A custom fabricated component for the burner assembly, manufactured at the Jones Road shop in...
1992
September 14, 1992
Sections of the burner assembly being custom fabricated by Kubes Steel.  Steel rolled on the...
1992
September 12, 1992
Custom fabricated base for the burner assembly manufactured at the Jones Road shop in 1992.
1992
September 12, 1992
Photos showing progress on the burner assembly for a chemical plant, custom fabricated by Kubes...
1992
July 22, 1992
Photos showing the progress of the custom fabrication of a chemical burner assembly.
1992
July 20, 1992
Fabricated fan assembly shipping out from Kubes Steel in Stoney Creek, Ontario.
1992
July 18, 1992
Completed fabricated fan housing assembly in the Kubes Steel yard awaiting shipment.
1992
July 1, 1992
Fabricated fan housing assembly by Kubes Steel, 1992.
1992
June 27, 1992
Further progress of our fabricated fan housing assembly.
1992
June 20, 1992
Early stages of fabricating a fan housing assembly at Kubes Steel.
1991
1991
February 21, 1991
Photo at the Atox Cement Mill showing the fabricated steel railing and mezzanine by Kubes Steel.
1990
kubes-steel-pedestrian-bridge-tbt-3
November 10, 1990
Newly installed in 1990, a pedestrian bridge in Greensville, Ontario next to the Greensville Optimist...
1990
April 30, 1990
Completed sections of the hydroelectric penstock custom fabricated at Kubes Steel.
1990
April 25, 1990
Assembled custom fabricated penstock for a hydroelectric power generation project.
1990
February 21, 1990
Kubes staff with sections of the hydroelectric penstock custom fabricated at Kubes Steel.
1988
1989
April 1, 1988
Hydraulic turbine spiral scroll case, one of three manufactured by Kubes Steel. These units were...
1988
March 1, 1988
One of three custom fabricated hydraulic spiral scroll cases manufactured by Kubes Steel.