At Kubes Steel, custom fabrication is our specialty. We can make almost anything you can imagine. Our wide range of equipment enabled our skilled operators to fabricate this Gas Flare Stack completely in-house, including delivery of the finished piece. 

Project Date: 
Tuesday, April 23, 2019
Market: 
Material: 

These heavy steel frames will be used to hold customizable modular components. Kubes Steel performed the fabrication and welding services and we deliver the completed frames directly to the job site.

Project Date: 
Wednesday, April 10, 2019
Market: 
Material: 

Kubes fabricated and machined these heavy duty, industrial scale components. We are specialists in fitting, welding, machining and assembly of any components like these.

Project Date: 
Wednesday, April 10, 2019
Market: 
Material: 

Kubes was selected as the fabricator to make these towers for electrical transmission lines. Each half is formed on our newest brake press and then welded together before shipping out to the installation site. Here, our operators are forming one of the halves and we can see a completed half as well.

Project Date: 
Tuesday, March 5, 2019
Market: 
Material: 

We take a look at some of the projects being worked on at the Kubes Steel shop on Burlington Street in Hamilton. There are many different types of Heavy Fabrication taking place.

Project Date: 
Friday, October 5, 2018
Material: 

Custom fabricated platform for the base of a turbine for a hydro-electric project in the United States.

Project Date: 
Thursday, July 20, 2017
Material: 

Custom fabricated 12' x 23'-6" bisulfite tanks for a chemical complex in Louisiana, USA.

Material: 

A series of custom fabricated Acid Tanks to hold sulfuric acid, fabricated and manufactured at Kubes Steel's Jones Road shop.

Service Category: 
Project Date: 
Friday, March 31, 2017
Market: 
Material: 

The connection nodes custom fabricated by Kubes Steel were a perfect fit for the new attirum of Parliament Hill in Ottawa Ontario.

Service Category: 
Project Date: 
Wednesday, November 9, 2016
Market: 
Material: 

Fabrication of the top of a 930 ft. elevator shaft reline (92 shells x 14’ – 6’’ dia. x 10 ft. long.)  Starting from the bottom the shells are more heavily constructed and as we get nearer the surface the shell thickness lessens as do the number of external stiffener rings. The average weight per shell thru the first 30 has been about 46,000 lbs.