Follow Us:      

Call Us: 1.877.327.8357

Menu

Kubes Steel rolled steel for both the water tower (rolled joist angles & compressions rings) and for the pumping station (rolled structural steel) for this project in Guelph, Ontario.

Material: 

Kubes Steel was contracted to build the track for the latest roller coaster for Canada's Wonderland.  Known as The Guardian, the roller coaster is part of an interactive ride that starts inside Wonder Mountain.  Kubes was tasked with the full fabrication, fitting and pipe bending of the roller coaster track and the adjoining railing for the project. 

Material: 

Kubes Steel fabricated a series of draft tube liners (also known as penstocks) for the Cannelton Hydroelectric project located on the Ohio River.  Each assembled section is 30 feet in diameter and 60 feet long.  When completed, water from the Ohio River will be directed through the penstocks to the turbines, which will turn generators and produce approximately 88 Megawatts of electricity.  The project adjoins the existing Cannelton Locks and Dam in Kentucky.

Material: 
Service Category: 
Project Date: 
Sunday, January 27, 2013
Market: 
Material: 

Kubes Steel supplied the rolled pipe for the St. Patrick's Bridge project.  The St. Patrick's bridge is a 184 metre long cable stayed bridge conforming to AESS standards. It is a key part of the revitalization of St. Patricks Island in Calgary, AB.

Project Date: 
Wednesday, January 23, 2013
Market: 
Material: 

A pair of custom fabricated fan housing assemblies.  Part of a power generation project.

Project Date: 
Monday, December 31, 2012
Material: 

Kubes Steel rolled all of the structural steel sections for the roof of the Lakeview Water Treatment Plant expansion in Mississauga, Ontario.

Material: 

A series of large steel sections bent on the Roundo R13 bending machine the Hard Way at Kubes Steel.

Project Date: 
Thursday, August 2, 2012
Market: 
Material: 

Lots of different kinds of rolled material in the shop!  Angle, Section, Channel & HSS.

Pages