Metals

Metals Projects:

Kubes Steel’s testing and certification service means you can rest assured that your job will be done to your exact specifications and parts will be received ready to use. We recently engineered and built this custom 16′ x 16′ platform to test 53′ long custom articulating fabrications weighing 53,000 lbs.

Anything can be made in the Custom Fabrication shop at Kubes Steel. Recently we fabricated this Cobble Guard for a customer in the metals manufacturing industry. This assembly brings together the processes of general steel fabrication, machining and final painting.

Project Date:
Wednesday, May 13, 2020
Material:

This custom fabrication job for handrails involved tube rolling and welding. They were designed and built to unique customer specifications. These will be installed as a safety measure around a pig iron caster.

This industrial bearing shell was custom fabricated by Kubes Steel, the heavy shell plates are brought in cut-to-size where we start with the press brake to form them into half cylinders. After forming the plate, our welders take over to assemble the shell halves and prepare them ready for the machining process and ready to…

Project Date:
Tuesday, May 5, 2020
Material:

Kubes Steel is Where Metal Takes Shape! From 3/4″ copper plate our skilled operators create these conical shaped 17′ long cylinders as a single piece with our 2500 Ton Brake Press. Custom fabricated parts like these have many uses in the metals industry such as the melt shop, foundry and as furnace liners. Check out…

Kubes Steel offers refurbishment services for hard faced rolls used in several industries including aggregates / mining, coal and manufacturing / steel making. After gouging out the cracked sections, they are welded back in with alloy steel and then smoothed down in preparation for hard faced overlay. Rolls of this kind can also be straightened as part of our maintenance…

Service Category:
Project Date:
Wednesday, October 30, 2019
Material:

A long section of HSS (Hollow Structural Steel) gets bent on the Kubes Steel induction bender to a tight radius.

Project Date:
Tuesday, August 4, 2015
Market:
Material:

A large section of steel channel gets rolled toe out at the Kubes Steel rolling and bending shop.

Project Date:
Friday, January 4, 2008
Market:
Material:

Custom fabricated calcine transfer container manufactured by Kubes Steel.

Project Date:
Saturday, January 15, 2000
Market:
Material: